Jump to content

odonnell

Members
  • Content Count

    4
  • Joined

  • Last visited

Everything posted by odonnell

  1. odonnell

    University Project

    Start with the design. This starts with the definition of the operational requirement, confirmation of legislative and regulatory codes, confirmation of management requirements all which lead to the start of the technical design process. Hope this helps. Ilkie Thanks very much for this.
  2. Hi there, I am currently gathering information regarding CCTV as part of a report for university. I am of a mechanical background studying Building Services Engineering; however, the report is for an electrical module therefore I’m trying to gather as much information as possible on the subject. I would be extremely grateful if you could help me with any information on any regarding any technical information (Design, Installation, Cabling etc to be based on a new office building) I have bought a reference book 'CCTV Surveillance Video Practices and Technology' by 'Herman Kruegle' I would greatly appreciate any information or help on where to get the relevant information. Kind Regards,
  3. odonnell

    University Project

    I never expected anyone to fish for me at all, Only looked for someone to point me in the right direction for information
  4. odonnell

    hello all

    Hi everyone, I am new to the forum and new to CCTV in general. I have been tasked with a project/report on CCTV for university therefore thought it would be a good idea to ask the guys on here who are clued up on this sort of stuff. Cheers.
×