blowrabbit 0 Posted June 4, 2007 When I was a general contractor building small commercial resturants I would marvel at how the electrician would use a heat blanket to bend the schedual 40 pipe for exterior underground runs. It would be a loose as a noodel and then months later when he had to come back and run the wires he used a milwakkee vacum to clear the lines then run the fish tape and wire. Its not really that hard. Share this post Link to post Share on other sites
kelvin 0 Posted June 6, 2007 I have my own Installer team. So no problem for install anything Share this post Link to post Share on other sites